ST Engineering's US Shipyard wins Bouchard contract
Construction begins in April.
In a release, ST Engineering announced today that its US shipyard, VT Halter Marine, Inc. has won a shipbuilding contract, from Bouchard Transportation Co., Inc. to build an Articulated Tug Barge unit. The contract comes with an option for an additional unit which has a validity of 60 days from the contract date.
The barge measures 625 feet by 91 feet by 47 feet and has a 250,000-barrel capacity. It will be used to transport liquid petroleum. The barge will be American Bureau of Shipping and United States Coast Guard certified for Jones Act service. The 10,000hp twin screw ATB tug, classed by ABS as XA1 Towing Vessel, Dual Mode, USCG Sub-chapter M, will be equipped with an Interconnected Coupler System.
Construction of the barge will begin in April 2013 at VT Halter Marine’s Pascagoula facility, with delivery scheduled in mid 2015. This unit will enter into Bouchard’s fleet service in New York.